Futuramic @futuramic.com · May 15

The Artemis III SLS core stage undergoes assembly operations inside High Bay 2 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on May 12, 2026. This is the first time Artemis core stage assembly operations have been conducted at the spaceport. 📸 @NASA / Kim Shiflett

0 likes 0 replies

?