Back in 1949, the North of Scotland Hydro Electric Board ordered a 100 kW “windmill”. This was installed and trialled at Costa Head, Orkney, in 1951. We’ve come a long way since then!
1 likes 0 replies
?
Back in 1949, the North of Scotland Hydro Electric Board ordered a 100 kW “windmill”. This was installed and trialled at Costa Head, Orkney, in 1951. We’ve come a long way since then!
1 likes 0 replies