Alright, end of day one: lots of work getting the electricity supply from our (awkward, old) consumer unit, and a lot of very shiny copper pipe fitted. Also, not pictured, chonky 180l water tank lugged up to the attic. For the moment I still have heat and hot water via the boiler.
2 likes 3 replies
?